full beam

英 [ˌfʊl ˈbiːm] 美 [ˌfʊl ˈbiːm]

n.  (车前灯的)最强亮度,最强光

医学



牛津词典

noun

  1. (车前灯的)最强亮度,最强光
    the brightest light that a vehicle's headlights can give, usually used when there are no street lights and no other traffic
    1. Even with the lights on full beam I couldn't see very far.
      即使把灯打到了最强光我还是看不了多远。

双语例句

  1. Electro hydraulic servo system, full loop controlling the synchronization of the upper beam.
    电液伺服系统,全闭环控制滑块同步。
  2. The approaching car's headlights were on full beam.
    汽车大开着前灯驶来。
  3. Interior spaces are impressively maximized by the full beam concept, while large hull portholes maximize the natural light in all cabins.
    内部的空间设计是以宽敞的船舱为亮点,自然光线透过舷窗,照亮了船舱的每一个角落。
  4. For the features of force on the full steel heterotypical arch bridge, an easy and appropriate method is proposed for installation of the hanger rod by jacking the tie beam.
    针对全钢异型拱桥的受力特点,提出一种简单适用的顶系梁安装吊杆的施工方法。
  5. The arch-beam composite bridge gives full play to advantages of the arch and beam in the load-carrying capability, showing superior and stable economic indicators and the aesthetic appearance.
    拱梁组合式桥梁使拱与梁在受力方面的优点得以充分发挥,呈现出优良、稳定的经济指标与美观的外形,因而是一种具有很大潜力的桥梁结构型式。
  6. Research on Dynamic Performance of Full Prestressed Concrete Beam and Identification of Virtual Prestressing Force
    全预应力混凝土梁动力性能研究及有效预应力识别
  7. The full curves of stress and strain at the key location of the beam are given, and the results are also compared with that of homogeneous materials.
    研究中还给出了梁关键部位的应力应变全过程曲线,研究成果还与未考虑材料的非均质性的结果进行了比较。
  8. By comparison of the relation between deflection and bending moment of beam of full prestress, part prestress and common reinforced concrete, many advantages of part prestressed concrete beam are presented, and those advantages can be referenced in project construction practice.
    通过对全预应力、部分预应力、普通钢筋砼梁弯距&挠度关系曲线的比较分析,指出了部分预应力砼梁的诸多优点,可以在施工实践中予以借鉴。
  9. If the full span wall is on the transfer beam, they could work together;
    当转换梁上作用非满跨剪力墙时,受力状态比较复杂,梁和墙部分共同工作;
  10. Stability calculation of full space support of cast-in-site beam
    现浇梁满堂支架的稳定计算
  11. That the main factors related to the full curve and fire resistance load ratio were the thickness and the height of the steel beam;
    影响全过程曲线和抗力折减系数的主要参数是梁高和钢梁厚度,而其他参数影响较小;
  12. An optical spectroscopy based on Doppler shift is applied to measuring energy and the percentages of the four energy component& the full energy, half energy, third energy and the eighteenth energy of diagnostic neutral beam ( DNB) on HT-7 Tokamak.
    实验测量了诊断中性束(DNB)中H0的4种主要能量成分(全能量,半能量,1/3能量,1/18能量),运用光谱法来分析中性束的束成分所占百分数。
  13. The limited unit theory of the linkage based on adopts the numerical analysis of parameterization, the full course nonlinear analysis that the simple beam of prestressing force is in progress from the feed to destruction to the body, and the derivation calculation formula in the analysis course;
    基于配筋混凝土结构非线性分析的基本理论,推导了分析过程中的计算公式,对体外预应力混凝土简支梁从加载到破坏的全过程进行了分析;
  14. Test Device Design for Full Scale Prestressed Concrete Beam on the Spot
    足尺预应力混凝土梁现场试验装置设计
  15. Experimental study on antiseismic behavior of a full scale building of 6-story porous brick and small-size hollow concrete block structure with constructional column beam system
    构造柱-圈梁体系外多孔砖内混凝土小型空心砌块六层足尺房屋抗震性能试验研究
  16. On the basis of full scale vehicle crash tests, a simple vehicle crash simulation method ── flexible beam method is developed.
    本文在实车碰撞实验的基础上,提出了汽车与护栏碰撞的简化计算方法&柔性梁法。
  17. In the model, vehicle was treated as a full dynamic rigid multi-body model with doubled suspension systems, Euler beam was utilized to model rails, and the control system of maglev was also taken into consideration.
    在模型中,磁悬浮车辆被视为多刚体,并具有两系悬挂系统,轨道被视为弹性欧拉梁,并考虑了磁悬浮车辆的控制系统性能。
  18. To study the interface slip and the deflection properties of a new type of steel-encased concrete composite beams, four full size simply supported specimens with different shear connection coefficient were designed. One was a beam with full shear connection, and the others with partial shear connection.
    为研究新型外包钢-砼组合梁的钢-砼交界面相对滑移及变形性能,设计4根不同剪力连接系数足尺简支梁,其中1根为完全剪力连接组合梁,其余为部分剪力连接组合梁。
  19. An experimental research on 12 full size specimens of CFT-steel beam space joint with outer concentric annular-stiffer.
    对12个足尺钢管混凝土柱-钢梁外加强环空间节点进行了静力试验。
  20. High Speed Full Range Complex Spectral Optical Coherence Tomography System with Special Coating Beam Splitter
    采用特殊镀膜分束器的高速全范围复谱OCT系统
  21. The Construction Checking Computation of the Full Support of Highway Bridge Engineering Cast-in-situ Beam
    公路桥梁工程现浇梁满堂支架施工验算
  22. Interface Slip and Full Process Analysis of Double Steel-Concrete Composite Beam under Negative Bending
    钢-混凝土双面结合梁负弯矩区滑移及受弯全过程分析
  23. The scheme makes use of strict collimation of the beams, full solid angle detection of the reaction products with a x y position sensitive Δ E E counter telescope, mixing trigger and pileup rejection to carry out the measurement of angular distribution under low beam intensity.
    采取次级束的严格准直、反应产物的两维位置灵敏全立体角探测、抗脉冲堆积和混合触发电子学线路等一系列措施,成功地实现了低流强条件下反应角分布的测量。
  24. Full framing construction technology of cast-in-place box beam of over-bridge
    公跨铁满堂支架现浇箱梁施工技术
  25. Based on the full size model test and theoretical analysis, this research investigates the seismic behavior of the joint between concrete-filled square steel tubular column and composite beam with U shape steel plate encased concrete under cyclic load.
    本文通过足尺模型试验和理论分析对外包U型钢-混凝土组合梁与钢管柱连接节点的静动力性能进行了研究。
  26. The Monte Carlo method is adopted to simulate the radiation of surface sources. In this paper, we set up the Monte Carlo models proper to circular V-groove surfaces and six prism honeycombed surface, use full beam tracking simulation of radiation to calculate their emission rates.
    采用MonteCarlo方法分析面辐射源时,建立了具有环形V型槽表面和六棱柱蜂窝状表面的辐射源的MonteCarlo模型,采用完全光束跟踪对辐射情况进行模拟,计算了它们的发射率。
  27. Cantilever construction or full framing is commonly used to construct cable-stayed bridge with cradle. It is the first time for Slide Die Carrier to be used in main beam, GongHe cable-stayed bridge.
    斜拉桥一般都利用挂篮采用悬臂法施工或采用满堂支架法施工,而公和斜拉桥首次将滑动模架法应用于斜拉桥的主梁施工中。
  28. The using of full digital control mode in each part of phased array radar leads higher technical requirements on beam controller including fast operating speed, few equipment, large dada handling capacity, multiple operation modes and high integrated level.
    相控阵雷达的各个部分开始采用全数字化的控制方式,这对波束控制器提出了更高的技术要求:运算速度快、设备量少、数据吞吐量大、工作方式多、集成度高。